What permits do I need to build a house?

After obtaining your septic and well permits from the Health Department, you will first need a land disturbing permit issued by the Environmental Department and a zoning permit issued by the Planning and Zoning Department. Application may be made for all permits simultaneously or individually in stages. After the building permit is issued, subsequent permits will be needed such as the trades permits, including electrical, plumbing and mechanical permits. View list of steps (PDF).

Show All Answers

1. When is it a requirement to obtain a permit?
2. What permits do I need to build a house?
3. How much does a permit cost?
4. Do I need a permit for a swimming pool?
5. Do I need plans to build a deck?
6. What about inspections after obtaining a permit?
7. Can I apply for my own permit as a homeowner?
8. How do I know if my contractor has a license?
9. How do I know what the codes are?
10. Do I need a permit for a fence?
11. Do I need a permit to demolish a building?
12. When can I speak to an inspector?
13. What if I don't 'build' something, just do interior work?
14. What is the wind load for Gloucester County?
15. How can I get information about my septic system?
16. How can I find out if my property is located in a flood zone?
17. What if my building is only temporary?
18. What about wood stoves?
19. What's the difference between a manufactured home and a modular?